Costa Oil. Tampa, Florida. July 2023 to February 2024.
An existing car wash bay had to become a working oil change service pit.
Demolition, excavation, formed and reinforced concrete pit, coated floor.
The car wash bay was converted into a service pit with a coated floor.
Commercial drywall and metal stud framing | Commercial construction | WeWork Reception Renovation, Brickell City Centre | Subway Restaurant Remodel, Des Moines Area, Iowa | Luis Cano, founder